Weighing & Batching Sensors
Load cells, weighing indicators, junction boxes, digital weight transmitters for aggregate, cement, water and admixture.
Weighing Sensors & Load Cells for Concrete Batching Plants
Quality replacement parts with factory-direct pricing. Contact us for a complete list.
Available Weighing Sensors & Load Cells
| Part Name | Common Material | Specifications |
|---|---|---|
| Load Cells | Shear beam, compression | 0.5 – 50 t capacity |
| Weighing Modules | Stainless steel | For silos and hoppers |
| Junction Boxes | Waterproof, 4-8 inputs | For multi-cell systems |
| Weight Indicators | Digital, IP65 | For batching control |
| Calibration Weights | Cast iron, certified | Custom sets |
How to Order the Right Parts
To ensure the correct fit, please provide us with:
- Your mixer / plant model (e.g. HZS120, JS2000)
- The part name and quantity needed
- Photos or drawings of the worn part (if available)
- Your plant's serial number or year of manufacture
Need a quote? Send us your plant model and part list — we respond within 4 hours with specifications, material options and factory pricing. WhatsApp: +86 187 6888 8850
Weighing Sensors & Load Cells FAQ
What load cell capacity do I need for cement weighing?
Cement hoppers typically use 1-3 t load cells (3-4 per hopper). Send us your hopper capacity for exact sizing.
Are your load cells compatible with existing indicators?
Most shear beam load cells are mV/V output and work with standard indicators. Provide your current cell specs for compatibility check.
Do you offer weighing system calibration?
We supply certified calibration weights and provide guidance for field calibration.
How often should batching plant load cells be calibrated?
Check with test weights at commissioning, after any cell or junction box work, and then on a schedule that matches how much the plant runs — quarterly is common on two-shift plants. Also recalibrate whenever the scale reading and a weighed batch disagree.
What causes a sudden zero drift on a scale that was fine yesterday?
A damp junction box, a loose terminal, or a damaged cable is far more likely than a failed cell. Read each cell individually with the scale empty before ordering anything.
Why does my scale read differently in summer?
Thermal expansion in the structure, viscosity change in hydraulic systems, and temperature coefficient in the cell and the wiring all contribute. If the shift is repeatable and returns in cool weather, look at the wiring and the junction box rather than the cells.
Can I replace just one load cell in a set of three?
You can, but the new cell will respond slightly differently from the two older ones and the sum will be off. Replace the set where budget allows, or at least recalibrate with test weights afterwards and expect to replace the others soon.
Size the cell for the load it actually sees
A load cell is chosen on capacity and on the dead load it carries, not on the batch weight alone. A 1,000 kg capacity cell under a hopper that already weighs 600 kg empty is working close to its limit for most of its life, and cells run near capacity drift sooner and fail earlier than cells with margin. When you replace a cell, match the capacity marked on the original unless you have a reason to change it — and if you do change it, change the whole set, because the panel is calibrated against the sum.
The environment matters as much as the number. Washdown areas need a sealed cell with a proper IP rating and, just as important, cable entry that stays sealed. We see far more cells destroyed by water travelling down the cable into the cell body than by overload. A loop of cable below the gland, a drip loop, costs nothing and prevents most of it.
Cell capacity by scale
| Scale | How capacity is normally split | Note |
|---|---|---|
| Aggregate weigh hopper | Total capacity split across 3 cells, each rated above the share it carries | Check the nameplate, not the batch size |
| Cement weigh hopper | Smaller cells, often 3-point support | Vibration and aeration both affect reading |
| Water scale | Usually a single cell or a flow-metered system | If flow-metered, drift is a meter problem not a cell |
| Additive scale | Small capacity cell, sensitive to mounting stress | Do not overtighten mounting bolts |
| Belt weigher | Single or dual cell under the frame | Belt tension affects reading as much as the cell |
Moisture, not load, is what kills cells
When a cell fails, open the junction box first. Water sitting in the box, terminals gone green, or a desiccant sachet that has been saturated for months tells you the failure started above the cell. Re-terminate, dry the box, fit a new desiccant, and check that cable entries point down. Replacing the cell without fixing the box means replacing it again next season.
Sudden zero drift with no load change is worth testing before buying: with the scale empty, read each cell individually. A cell that has taken water typically reads low and unstable, or jumps when the cable is flexed. A cell that has been overloaded reads consistently off across the range.