Concrete Plant Installation & Commissioning Services
Professional mechanical, electrical, and automation installation for concrete batching plants. Full commissioning and calibration to get your plant producing quality concrete from day one.
Installation Timeline (HZS90)
From Containers to Full Production
Whether your concrete plant is arriving from a relocation project or is brand new from the factory, the installation and commissioning phase determines how quickly and reliably it will start producing. This is where years of field experience make the difference between a plant that runs for decades and one that has constant issues.
HZSMOVE's installation teams have completed projects across Africa, the Middle East, and Asia. We work to the highest standards of mechanical precision, electrical safety, and automation accuracy.
Installation Services
Mechanical Installation
Full structural assembly: mixing platforms, silos, conveyors, aggregate bins. Crane lifts, bolted connections, alignment and leveling.
Electrical Installation
Control panels, motor control centers, cabling, sensors, VFD drives, grounding and lightning protection.
Automation & PLC Setup
Programmable logic controller configuration, weigh controller calibration, batching software setup and recipe programming.
Pneumatic & Hydraulic Systems
Air compressor installation, piping runs, hydraulic power units for silo aeration and dust collectors.
Commissioning Services
- Dry run testing 鈥?All motors, drives, conveyors, and gates tested without material
- Weighing system calibration 鈥?Aggregate, cement, water, and admixture scales calibrated to 卤1% accuracy
- Wet test 鈥?Full production cycle with material, mix design verification
- Control system validation 鈥?Automatic and manual mode testing, recipe accuracy checking
- Safety system testing 鈥?Emergency stops, interlocks, alarms, and warning systems
- Performance verification 鈥?Production capacity test against manufacturer specifications
Site Preparation Guidelines
For a smooth installation, we recommend the following site readiness before our team arrives:
- Concrete foundations fully cured (minimum 14-21 days after pour)
- Power supply available at the plant location (transformer capacity sized for plant load)
- Access road suitable for container trucks and mobile cranes
- Water supply connection available
- Drainage and runoff management prepared