Real concrete batching plant relocation, dismantling, and installation projects completed across three continents. Each case includes timelines, challenges, and measurable results.

HZS90 concrete plant dismantling and relocation in Nigeria Featured Project
21
Days
800
KM Moved
0
Incidents
100%
Output
Lagos 閳?Kano, Nigeria Q1 2026 HZS90

HZS90 Plant Relocation Across Nigeria

Full dismantling of an HZS90 concrete batching plant in Lagos, overland transport 800km to Kano, and complete reinstallation with commissioning. The client needed minimal downtime 閳?their construction project in Kano was already behind schedule.

Challenge: Poor road conditions on the Lagos閳ユ彅ano route required special packaging and load distribution. The plant had been in service for 7 years 閳?several bolted connections were rusted and required cutting.
Dismantle6 days
Pack & Ship5 days
Install7 days
Commission3 days
21 daysTotal Timeline
ZeroSafety Incidents
98%Output Retention
HZS90 Full Relocation Overland Africa
Twin HZS120 concrete plant installation in Tema, Ghana
28
Days Install
240
m椴?h Capacity
14
Team Members
Tema, Ghana Q3 2025 2鑴?HZS120

Twin Plant Installation for Highway Project

Greenfield installation of two HZS120 concrete plants for a major highway construction project. Full scope included foundations, structural erection, electrical integration, automation setup, and commissioning.

Challenge: The site had poor soil conditions requiring reinforced foundations. Two plants needed to be synchronized for automated batching with shared aggregate and cement storage. The client's deadline was fixed 閳?the highway tender had a penalty clause.
Foundations8 days
Structure10 days
Electrical6 days
Commission4 days
On TimeDelivery
Full AutoBatching System
1 YearWarranty
HZS120 Twin Plant Greenfield Highway Turnkey
HZS180 plant containerized for shipping to Saudi Arabia
Cross-Continent Move
12
Containers
45
Days Total
40%
vs New
Europe 閳?Riyadh, Saudi Arabia Q4 2025 HZS180

Used Plant Export from Europe to Saudi Arabia

Sourcing a used HZS180 plant from Europe, managing the entire cross-continent relocation: dismantling, containerized ocean freight, customs clearance in Saudi Arabia, and reinstallation with full commissioning in Riyadh.

Challenge: The plant was manufactured to European electrical standards 閳?all control panels needed reconfiguration to Saudi power specifications. Customs clearance required complete dismantling documentation and proof of original manufacture.
Source & Dismantle14 days
Shipping18 days
Customs5 days
Install & Commission13 days
40% Savedvs Buying New
12Containers
3 CountriesLogistics Chain
HZS180 Cross-Continent Used Plant Export Saudi Arabia
HZS75 concrete plant team at work in Indonesia
Remote Site
12
Days Install
0
Lost Parts
2
Techs Remote
Sumatra, Indonesia Q2 2025 HZS75

Remote Site Installation in Sumatra

Installation and commissioning of an HZS75 concrete plant at a remote mining site in Sumatra. Equipment and materials transported via barge and unpaved roads. Limited local technical support available 閳?two HZSMOVE technicians handled the entire electrical and automation setup.

Challenge: No grid power at the site 閳?the plant needed to run on a generator. Heavy rainfall during monsoon season delayed foundation work by 5 days. All automation training was delivered via video link due to travel restrictions.
Logistics7 days
Civil Works8 days
Installation8 days
Commissioning4 days
Remote SetupFull Commissioning
Gen ReadyOff-Grid Operation
100%Parts Accounted
HZS75 Remote Site Indonesia Off-Grid Mining
HZS60 plant relocation via rail in Uzbekistan
Rail + Road
18
Days
1,200
KM by Rail
6
Workers
Tashkent 閳?Samarkand, Uzbekistan Q1 2025 HZS60

Relocation via Rail Freight in Central Asia

Relocation of an HZS60 plant from Tashkent to Samarkand 閳?the client needed to move their production capacity closer to a new infrastructure project. Rail transport was the only viable option for the heavy sections (silos, mixer frame).

Challenge: The plant had been modified from its original design with custom-fabricated extensions. The as-built drawings were outdated 閳?our team had to document the actual configuration during dismantling. Border procedures for rail freight required detailed customs documentation in both Uzbek and Russian.
Dismantle5 days
Rail Freight4 days
Install6 days
Commission3 days
1,200 kmBy Rail
Custom FixNon-Standard Parts
BilingualDocumentation
HZS60 Central Asia Rail Freight Uzbekistan Custom Plant
HZS120 plant restoration in Addis Ababa, Ethiopia
Storage 閳?Relocation
1.5
Years Idle
Addis Ababa, Ethiopia Q4 2024 HZS120

Idle Plant Restoration & Relocation in Ethiopia

A client had an HZS120 plant that had been sitting idle for 1.5 years after a project cancellation. The plant was exposed to weather and in unknown condition. We performed a full condition assessment, dismantled, replaced damaged components, and relocated to a new construction site 50km away.

Challenge: Rust and weather damage to electrical cabinets, seized bearings on the mixer, and missing documentation from the original installation. Several structural bolts had corroded beyond safe use. The project required a mix of restoration (new bearings, rewiring) and relocation.
Assessment3 days
Restoration7 days
Dismantle5 days
Reinstall6 days
RestoredTo Full Condition
14 PartsReplaced
65%Cost vs New
HZS120 Idle Plant Restoration Ethiopia Weather Damage