Addis Ababa, Ethiopia
Q4 2024
HZS120
Idle Plant Restoration & Relocation in Ethiopia
A client had an HZS120 plant that had been sitting idle for 1.5 years after a project cancellation. The plant was exposed to weather and in unknown condition. We performed a full condition assessment, dismantled, replaced damaged components, and relocated to a new construction site 50km away.
Challenge: Rust and weather damage to electrical cabinets, seized bearings on the mixer, and missing documentation from the original installation. Several structural bolts had corroded beyond safe use. The project required a mix of restoration (new bearings, rewiring) and relocation.
Assessment3 days
Restoration7 days
Dismantle5 days
Reinstall6 days
RestoredTo Full Condition
14 PartsReplaced
65%Cost vs New
HZS120
Idle Plant
Restoration
Ethiopia
Weather Damage