If you own or operate a concrete batching plant anywhere in Africa — from the busy construction sites of Lagos to the mining operations in Zambia's Copperbelt — you already know the biggest challenge is not moving the plant. It's keeping it running. A plant that stops costs you thousands of dollars a day in lost production. That is why at HZSMOVE, we have built our business around what matters most: keeping your plant operational with genuine spare parts and expert technical support. Relocation is something we do well, but parts supply is what we do best.

This guide covers everything you need to know about concrete plant parts supply and relocation across Africa. Whether you need mixer blades delivered to your site in Nairobi within a week, or you are planning a full plant move from Ghana to Nigeria, HZSMOVE has the inventory, the logistics network, and the technical team to make it happen.

Your One-Stop Parts Source for Concrete Plants in Africa

Every plant relocation starts with a plant that is in good working condition. The difference between a smooth relocation and a nightmare is whether your plant has the right parts before the move. Broken mixer arms, worn-out liners, faulty sensors — these problems do not get better during transport. They get worse.

HZSMOVE maintains a comprehensive inventory of concrete batching plant spare parts covering all major HZS models: HZS60, HZS90, HZS120, HZS180, and HZS240. Our warehouse in Zhengzhou stocks over 2,000 line items ready for immediate shipping to any African destination.

What Parts Do We Supply?

Need Genuine Spare Parts for Your Plant?

Tell us your plant model and we'll send you a complete parts catalog with prices within 24 hours. We ship to any African port — Lagos, Mombasa, Tema, Dar es Salaam, Durban, and more.

WhatsApp us now: +86 187 6888 8850

Chat on WhatsApp →

Concrete Plant Relocation Services Across Africa

Beyond parts, HZSMOVE provides end-to-end concrete plant relocation services. We have successfully relocated over 50 concrete batching plants across 15+ African countries since 2008. Our team understands local conditions, port logistics, and regulatory requirements in every major African market.

Our Step-by-Step Relocation Process

Phase 1: Pre-Move Assessment & Parts Audit
Before we touch a single bolt, we inspect the plant from foundation to top silo. We identify every wear part that should be replaced before the move — mixer blades, liners, seals, belts, sensors. This avoids the common trap of shipping a broken plant only to discover at the destination that critical parts are unavailable. We quote the parts and the relocation as a single package.

Phase 2: Professional Dismantling
Our experienced teams dismantle the plant in a systematic, labeled sequence. Every electrical connection is tagged. Every bolt is bagged and numbered. Hydraulic lines are drained, capped, and marked. A full HZS120 plant can be dismantled by a 6-person team in 5–7 working days. We photograph every stage for your records and future reinstallation reference.

Phase 3: Container Loading & Sea Freight
Components are packed into 20ft and 40ft containers based on size and fragility. A typical HZS60 plant requires 3–5 containers; an HZS120 requires 6–8; an HZS180 can need 10–14 containers. We handle all shipping documentation, including Bill of Lading, Packing List, Commercial Invoice, and Certificate of Origin. Dangerous goods declarations for hydraulic oil and batteries are prepared in advance.

Phase 4: Destination Customs Clearance
We work with licensed customs brokers in the destination country to ensure smooth clearance. Our team pre-arranges SONCAP (Nigeria), PVoC (Kenya), GSA (Ghana), or ZABS (Zambia) certifications as required. We also coordinate with your importer to prepare Form M (Nigeria) or IDF (Kenya) before the vessel arrives.

Phase 5: Reinstallation & Commissioning
Our technicians travel to your site to supervise reassembly. We rebuild the plant according to the dismantling photos and tagged components. After mechanical assembly, we perform electrical wiring, sensor calibration, control system testing, and a full trial run. We do not hand over the plant until it produces specification-grade concrete. Typical reinstallation timeline: 10–14 days for an HZS60, 14–21 days for an HZS120.

Cost Factors for Plant Relocation in Africa

Relocation costs vary significantly based on several factors. Here is what affects your total budget:

Typical Timeline for an Africa Plant Relocation

From first contact to full production at the new site, expect these durations:

Total: approximately 18–20 weeks from start to finish for a China-to-Africa relocation. Domestic moves within an African country can be completed in 4–8 weeks.

Important Considerations for African Plant Owners

1. Always Budget for Parts First

The single biggest mistake we see African plant owners make is budgeting for relocation but not for the parts that need replacing. If your mixer blades are 60% worn, they will not survive the move. If your conveyor belt has cracks, it will tear during handling. If your load cells are drifting, re-calibration after transport will be unreliable. We always quote a "move-ready" package that includes all recommended replacement parts. On average, our clients who do the full parts-and-relocation package save 40% on total costs compared to those who move first and fix later.

2. Country-Specific Import Rules

Each African country has its own rules for importing used batching plants. Kenya restricts used plants to under 8 years old. Tanzania applies higher duties on plants over 5 years. Nigeria requires SONCAP registration before the plant ships. Ghana accepts a GSA conformity certificate. Zambia requires a ZABS import permit. HZSMOVE handles all compliance paperwork as part of the relocation package — we have done it dozens of times and know exactly what each port requires.

3. Plant Age Verification

Before you buy a used plant in Africa with the intention of relocating it, verify its age. Customs authorities in Kenya, Tanzania, and Zambia will ask for the original manufacturer's production certificate or CE declaration. If the plant lacks documentation, age verification becomes difficult and expensive. HZSMOVE can help verify plant age through serial number lookup and manufacturer records.

4. Environmental Compliance

Draining hydraulic oil, cleaning cement residue from mixers, and disposing of lubricants must follow local environmental regulations. In Nigeria, NESREA oversees waste disposal during plant dismantling. In Kenya, NEMA requires proper management of industrial fluids. Our relocation teams include environmental compliance as a standard part of the service.

5. The Value of Keeping a Spare Parts Buffer

After your plant is relocated and running in its new location, we recommend keeping a buffer stock of critical spares on hand. Shipping from China to most African ports takes 25–35 days. If a mixer blade breaks and you have no spare, you lose a month of production. HZSMOVE offers consignment stock arrangements for regular clients — we hold a dedicated inventory at our warehouse that ships within 48 hours of your call.

Real Projects: Parts Supply and Relocation Across Africa

Nigeria — HZS120 Complete Parts Refresh and Relocation (2025)
A major Lagos-based concrete producer needed to move an HZS120 plant from Abeokuta to a new site in Ibadan. During our pre-move inspection, we identified that the mixer blades were at 70% wear, the main conveyor belt had significant edge damage, and three of six load cells were showing drift. We supplied a full wear parts kit (mixer blades, liners, belts, sensors, hydraulic seals) and completed the dismantle-ship-reinstall in 7 weeks. The plant was producing concrete at the new site within 10 days of the containers arriving in Ibadan.

Kenya — Emergency Parts Supply for Relocated HZS90 (2026)
A contractor in Nairobi had relocated an HZS90 plant from Mombasa but found during commissioning that the control panel touch screen was non-functional and two mixer arms had bent during transport. We air-shipped a replacement touch screen, a set of mixer arms, and a complete sensor calibration kit within 5 days. The plant was operational again the following week. This is why parts-first thinking matters.

Zambia — Full Relocation for a Copperbelt Mining Operation (2025)
A mining company in Ndola needed to move their HZS180 plant 400 km to a new pit site. The plant had been running for 6 years without major parts replacement. We supplied a full refurbishment kit (all wear parts, new control module, new silo aeration pads) and performed a complete dismantle, overland transport, and reinstallation. Total parts cost: $28,000. Relocation cost: $95,000. Result: a plant that performed better after the move than before.

Ghana — HZS60 Inter-Country Relocation from Tema to Ouagadougou (2024)
A West African road construction company moved their HZS60 plant from a completed highway project in Ghana to a new project in Burkina Faso. HZSMOVE coordinated the overland transport through the Tema–Ouagadougou corridor, supplied a set of new mixer blades and liners, and sent a technician to supervise reassembly in Ouagadougou. Total cost: $52,000 including parts. Timeline: 5 weeks from start to production.

Why Choose HZSMOVE for Your Plant Parts and Relocation Needs?

Ready to Talk About Your Plant?

Whether you need spare parts shipped to your site today or a full plant relocation planned for next month, we are here to help. Tell us your plant model, your current location, and your destination — we will send you a complete proposal within 24 hours.